Projects

Operational
Upcoming
Operational

  • Non recovery coke oven plant – 1×0.6 MTPA – 600000 TPA

  • CPP (Coke oven Gas based) –1X40MW – 40MW

  • DRI KLIN – 4 X 500 TPD + 4 X 350 TPD – 6,40,000 TPA + 4,48,000 TPA
  • CPP-WHRB (DRI) – 1X68 MW / 68 MW
  • MBF along with CDI injection – 12X320 M3 / 5,96,000 TPA

  • Sinter Plant – 1×60 m2 / 10,00,000 TPA

  • EAF WITH LF / LRF – 2 X 80 T / 8,32,000

  • LRF – 1X25 T / 2,08,000 TPA

  • CCM – 18,15,000 TPA

  • Induction Furnace – 3X20 T / 2,92,000 TPA

  • ICCM – 2,80,000 TPA

  • ICPP (BF Gas based) – 1X22 MW / 22 MW

  • IAFBC – 1X120TPD / 35 MW

  • ASU – 1X120TPD – 3500 m3/h

Upcoming

  • LAM Coke – 12,00000 TPA
  • Electricity – 80MW

  • Sponge Iron – 10,88,000 TPA

  • Electricity – 68 MW

  • Pig Iron – 4,25,000 TPA

  • Sinter – 50,000 TPA

  • Liquid Steel – 4,16,000 TPA

  • Refined steel – 2X25T – 4,16,000 TPA

  • Liquid Steel – 12X20T – 7,92,000 TPA

  • Liquid Steel – 12X20 T – 7,92,000 TPA

  • Steel billet – 2,80,000 TPA

  • Electricity – 10mv
  • Gas – 3500 m3/h

  • Ferro Alloy – 4×9 MVA + 1 X18 MVA – 90,000 TPA

  • Pellet – 2 X 0.85 MTPA – 17,00,000 TPA

  • TMT & Structural – 2X 0.2 MTPA – 4,00,000 TPA